
The total size of the project, which began in May 2015, is $4.5 billion.
In this project, NTG products were preferred because, in line with the quality approach, it was necessary to use products manufactured with original raw materials and certified by DVGW.
Country
Kuwait
Area of Use
Drinking Water, Fire Line

